National Stock Number(NSN): 4410-00-008-8896 (4410000088896, 000088896)
| NIIN: |
00-008-8896 |
Item Name: |
HEATER,WATER,LIQUID FUEL |
INC: |
28060
|
| FSC: |
4410
|
Assignment Date: |
Jul-28-1972 |
CRIT: |
X |
IIG: |
28060 |
| ISC: |
5 |
Date Standardized: |
Feb-01-1975 |
HMIC: |
N |
DODIC: |
|
| NSC: |
0 |
Cancellation Date: |
|
PMIC: |
U |
FIIG: |
A23900 |
| ESD: |
|
Schedule B: |
8419.19.0080 |
DEMIL: |
A |
DEMIL INT: |
1 |
| TIIC: |
4 |
Originator: |
98 |
ADPEC: |
|
RPDMRC: |
2 |
| Part Number |
CAGE |
Company |
Status |
RN CC |
RN VC |
DAC |
RN AAC |
RN FC |
RN SC |
RN JC |
SADC |
HCC |
MSDS |
|
NA135 |
02146
|
RITE ENGINEERING & MANUFACTURING CORP |
C |
3 |
2 |
3 |
JS |
3 |
D |
|
|
|
|
| MOEC |
SOS |
A A C |
R C |
S L C |
CIIC |
U P Q |
U S C |
Unit Price |
UI |
UICF |
MCD |
Action Date |
C/H |
| DN |
SMS |
X |
|
0 |
U |
1 |
N |
$34,122.78 |
EA |
|
9B----- |
Oct-01-2025 |
C |
| DS |
SMS |
X |
|
0 |
U |
1 |
D |
$34,122.78 |
EA |
|
------- |
Oct-01-2022 |
H |
| DS |
SMS |
X |
|
0 |
U |
1 |
I |
$34,122.78 |
EA |
|
------- |
Oct-01-2025 |
C |
| MOEC |
PC |
Phrase |
QPA |
UOM |
OOU |
JTC |
| DS |
X |
FORMERLY FSC 4520 |
000 |
|
|
|
Technical Characteristics Information
| MRC |
Requirement Statement |
Reply Statement |
| TEXT |
GENERAL CHARACTERISTICS ITEM DESCRIPTION |
1300 GPH,C/O A COMPLETE PRE-WIRED,PRE-PIPED,PACKAGE TYPE HOT WATERGENERATOR,MTD ON A STEEL SKID BASE,TOTALLY ENCLOSED IN A WEATHERPROOFHOUSING,OIL FIRED,INDIRECT TYPE,HOT WATER BOILER,HOT WATER STORAGE TANK,CIRCULATING PUMP,HEAT EXCHANGERS,W/ALL NECESSARY PIPING,SUCH AS,FUELOIL,HOT WATER,RECIRCULATING,COLD WATER,DRAINAGE,VALVES,FITTINGS,GAGES,CONTROL PANELS,SAFETY DEVICES,REQUIRED FOR AN AUTOMATICALLYOPERATED UNIT,DESIGNED FOR CONTINUOUS AS WELL AS INTERMITTENT HOT WATERDRAW OFFS AT NORMAL TEMP OF 140 OR 180 DEG F,BOILER SHALL BE THE INDIRECTTYPE W/AN OUTPUT CAPACITY OF 1080000 BTU/HR CAPABLE OF HEATING 1300 GALLONSOF WATER PER/HR AT 100 DEG F RISE FROM 40 DEG F TO 140 DEG F AND CONTROL THEDISCHARGE WATER TEEMP WITHIN 5 DEG F OF SELECTED TEMP DURING CONTINUOUSOPERATION,THE SKID BASE IS EQUIPPED W/LIFTING EYES FOR LIFTING OR TOWINGTHE UNIT,O/A DIM.,APPROX 112 IN. LG,48 IN. W,100 IN. H |
| MOE Rule |
Former MOER |
Effective |
AMC |
AMSC |
IMC |
IMCA |
Collaborators |
Receivers |
| N9BC |
N9CD |
May-01-2006 |
3 |
H |
Z |
JN |
GX|JN |
GH|GX |
| YB01 |
|
Apr-01-1991 |
|
|
|
|
YB |
YB |
| YW01 |
|
Apr-01-1991 |
|
|
|
|
YW |
YW |
| ZI01 |
|
Nov-01-2020 |
|
|
|
|
ZI |
ZI |
| Description: |
HEATERS OIL/GAS TREATING I/S |
Originating Activity: |
JS |
| Hazardous Material: |
|
National Motor Freight Classification Number: |
122880 |
| Less Than One Truckload: |
P |
NMFC Sub-Item: |
X |
| Uniform Freight Classification Number: |
62410 |
Rail Variance Code: |
|
| Less Than One Carload: |
|
Water Commodity Code: |
72E |
| Type of Cargo Code: |
Z |
Special Handling Code: |
9 |
| Air Commodity Special Handling Code: |
VZ |
Air Dimension Code: |
A |
| Source: |
P |
Primary Inventory Control Activity (PICA) |
Status: |
C |
| Pri/Sec ICC: |
P |
Container NSN: |
|
Category Code: |
18DO |
| Lvl A Pkg Req: |
Q |
Unit Pack Size: |
|
Pres Material: |
ZZ |
| Lvl B Pkg Req: |
Q |
Unit Pack Weight: |
0.0 |
Pres Method: |
20 |
| Lvl C Pkg Req: |
|
Unit Pack Cube: |
0.000 |
Wrapping Mat: |
ZZ |
| Opt Proc Ind: |
O |
Unpkg Item Dims: |
|
Spec Marking: |
00 |
| Container FSC: |
|
SPI Number: |
|
SPI Revision: |
|
| Unpkg Weight: |
|
SPI Date: |
|
Pkg Design Activity: |
16236
|
| Inter Container Qty: |
AAA |
Inter Container Code: |
ZZ |
Clean/Dry Procedure: |
1 |
| Unit Container: |
10 |
Item Type Storage: |
B |
Unit Container Level: |
|
| |
|
Cush/Dun Material: |
ZZ |
Cush/Dun Thickness: |
C |
|